Magnetometry and Resistivity surveys were carried out over the site over a two week period during September 1995. Magnetometry was undertaken using a Geoscan FM36 Fluxgate Gradiometer with an ST1 sample trigger. Resistivity was carried out with a Geoscan RM15 Resistivity Meter with a twin probe array configuration. Following the establishment of the surveying grid framework, all grids were subsequently surveyed in 1 m. transects with a sample interval of 0.5 m for magnetometry and 1 m. for resistivity. 

For a comprehensive discussion of the methodology please see Gale 1995 The Campanaio Project: a geophysical survey.