Magnetometry and Resistivity surveys were
carried out over the site over a two week period during September 1995.
Magnetometry was undertaken using a Geoscan FM36 Fluxgate Gradiometer with
an ST1 sample trigger. Resistivity was carried out with a Geoscan RM15
Resistivity Meter with a twin probe array configuration. Following the
establishment of the surveying grid framework, all grids were subsequently
surveyed in 1 m. transects with a sample interval of 0.5 m for magnetometry
and 1 m. for resistivity.
For a comprehensive discussion of the methodology please see Gale 1995 The Campanaio Project: a geophysical survey. |
|
Layout of geophysical survey guidelines |
Comments and enquires should be addressed to:
John Gale (email: jgale@bmth.ac.uk)